By Foshee Construction Team
Rather than treat scheduling as a single planning exercise, it helps to see it as a sequence that gets defended at each stage:
Before mobilization — Quantities, RFIs, permits, and utility locates get resolved so the field crew isn't discovering plan conflicts on day one. This is also when Foshee uses HeavyBid and AGTEK to make sure the schedule is built on quantities that match what will actually be dug, graded, and paved.
Early field work — Clearing, grubbing, and rough grading set the pace for everything downstream. A delay here compounds, because utilities and drainage can't start until the pad is shaped.
Mid-sequence — Underground utilities, erosion control, and drainage installation run in parallel where possible, but each depends on inspections clearing before the next trade can follow.
Final stretch — Final grade, stabilization, and paving need to be sequenced around Florida's rain patterns, since a single storm event can undo days of stabilization work if timing is off.
Handoff — The pad, utilities, and paving are inspected and signed off as a package, so vertical construction can start without inheriting open items.

The Hills of Minneola, a residential community in Foshee's home market of Minneola, is on track to wrap up by the end of the year. Keeping a residential sitework schedule intact means holding the sequence above tight across dozens of lots at once — grading, utilities, and paving staged so that vertical crews can move onto finished lots in a predictable order rather than waiting on a scattered patchwork of readiness across the site.
- Plan conflicts that should have been resolved as RFIs before mobilization instead surface in the field, stalling a crew mid-sequence.
- Inspections get scheduled without buffer, so a single delay pushes every downstream trade.
- Rain events aren't built into the plan, so stabilization work gets redone instead of protected.
- Utility sequencing isn't coordinated with grading, so trenching starts before the pad is ready for it.
- Nobody is tracking the schedule as one connected sequence, so a slip in one phase isn't caught until the next phase is already late.

Underground utility installation, because it depends on grading being finished and drives when paving and vertical construction can start.
Enough that a single rain event doesn't force a full re-sequencing. Erosion control and stabilization steps should assume rain will happen, not treat it as an exception.
Yes, but it takes active staging — grading, utilities, and paving need to be sequenced across the whole community, not lot by lot, so vertical crews always have a predictable set of finished lots to move into.
Ask how RFIs get resolved before mobilization, how rain delays are built into the plan, and how inspections are sequenced so one delay doesn't cascade through the rest of the job.
The critical path on most developments runs through sitework long before it reaches the building itself. A schedule that treats clearing, utilities, drainage, and paving as one connected sequence — defended at every stage — is what keeps a project like The Hills of Minneola on track to hand off finished, buildable lots on time.
Foshee Construction schedules Central Florida sitework to protect the handoff date vertical trades depend on. To discuss a project, start with the Foshee contact page - https://fosheeconstruction.com/contact.
- Why Self-Performed Sitework Gives Developers More Control - https://fosheeconstruction.com/blog/self-performed-sitework-developer-control
- Complete Site Prep Minneola - https://fosheeconstruction.com/blog/complete-site-prep-minneola
- Erosion Prevention on Construction Sites - https://fosheeconstruction.com/blog/erosion-prevention-construction-sites
- Underground Pipe Installation in Florida - https://fosheeconstruction.com/blog/underground-pipe-installation-florida
- Foshee Construction Blog - https://fosheeconstruction.com/blog
We build bids using HeavyBid and AGTEK because the details matter long before the job starts. When the numbers are accurate and the scope is clearly defined, it sets the tone for how the entire project runs. Estimating isn’t just a step in the process, it’s the foundation we build on.
That same mindset carries into the field. Our crew is trained to work with purpose, follow the Civil Engineers’ Plan to the finest detail, and hold the line on quality. When expectations are clear from day one, there’s no need for shortcuts, and no confusion about how the work gets done.
Clients trust our bid packages because they’re complete and ready to use. Project managers know what we’re covering, what’s excluded, and how we plan to approach the job. That clarity removes friction and lets teams focus on execution instead of interpretation.
As part of our review process, we go into the plans before anything hits the site. We ask the questions early, resolve issues before they show up in the field, and keep RFIs moving. This approach prevents delays and protects the timeline.
Over time, that consistency builds trust. Many of the people we work with today came through referrals from past projects – engineers, GCs, and superintendents who’ve seen how we operate and want the same experience again.

In 2024, Foshee Construction was acquired by Saga Infrastructure Solutions, a national network of civil construction companies. Saga supports regional contractors by giving them access to better tools, long-term resources, and operational backing, without changing how they run day to day.
Foshee will continue to operate under its name, with the same team and field leadership in place.
“From the very time a project starts, we start that partnership. We try to catch as much as we can with the tools that we have. Not everybody is using the software platforms we are. That’s the differentiator: we’re not just bidding. We’re anticipating, problem-solving, and making sure the job runs right.”
— Don, CEO, Saga Infrastructure Solutions
Foshee is now part of a broader regional strategy that includes Florida, the Piedmont Atlantic, Texas, Colorado, and the Arizona Sun Corridor. The name, crews, and standards remain. What’s improving is the support behind it.