Enclave
At Canopy Park

Market

Multi-family

Services

Erosion Control, Earthwork, Sanitary Sewer, Force Main, Lift Station, Storm Sewer, Potable Water, Reclaimed Water, Paving Systems, Offsite Turn lane Improvements

Client Type

Developer

Delivery Method

Subcontractor

Foshee Construction’s Role

Subcontractor

Self Performed

80%

Project Overview

Foshee Construction is performing the civil work for a new multi-family project located in Orlando, Florida. The project broke ground in 2024 and is expected to be complete November 2025.

The site work includes extensive preparation and infrastructure development, such as excavating 8,554 cubic yards of earth, installing 7 sanitary sewer manholes that ranged from 6’ deep to 9’ deep, installing 713 LF of sanitary sewer pipe, 409 LF of force main and a lift station, 5 precast storm structures, 21 yard drains, 3,011 LF of various sizes of storm pipe between 6”-15”, potable water pipe of 1,383 LF, installing 2,764 LF of, Class V Fire Protection 431 LF, paving system of 5,311 SY that includes asphalt paving, limerock base, 1,763 LF of curb & 11,367 SF of sidewalk, striping and signage. The Enclave at Canopy Park will benefit affordable housing for local residents.

We Don’t Cut Corners, Especially on Safety

Licensed & Insured to Operate Statewide

  • State Certified Underground Utility & Excavation Contractor (#CUC1226472)  
  • Type 5 Fire License
  • Fully insured in the State of Florida

Recognized for Safe Site Practices

  • Sunshine State Safety Recognition Award (2022)
  • Awarded for consistent compliance and safe jobsite execution across multiple projects

Industry Standards & Ongoing Training

  • Active participant: OSHA Safe & Sound Week
  • Annual involvement: OSHA Trench Safety Stand Down
  • Routine field training and safety reviews on all active sites

Let’s Talk About Your Next Site Development Project

We’re ready when you are. Reach out to start the conversation, request a bid or see how Foshee can support your next job.