Minneola sits on some of the more variable ground in Lake County, and that shows up fast once a site plan turns into an actual construction schedule. Rolling terrain, sandy subsoil, and seasonal rain do not care how clean the civil drawings look. What separates a smooth mobilization from a stalled one is usually how much of the "complete" in complete site prep actually got planned before equipment showed up.
Foshee Construction is based in Minneola and has built its site development practice around this exact terrain since 1994. That local footprint matters here: this is not a contractor learning Lake County's soil and drainage behavior on a client's job. It is the ground the company was founded on.
Developers often hear "site prep" and picture clearing and grading. In practice, a complete package on a Minneola site touches several disciplines that all have to land in the right order:
Skipping the sequencing on any one of these does not just delay that phase. It tends to push cost and delay onto whichever phase comes next.
Foshee's current work at The Hills of Minneola, a residential community project on track to wrap up by the end of the year, is a useful example of what full-sequence site prep looks like when it goes according to plan. The project has moved through clearing, grading, utility installation, and paving in a coordinated sequence rather than as isolated line items, which is a large part of why it is closing out on schedule.
The most common surprises on Minneola sites are not exotic. They are ordinary items that got assumed rather than confirmed:
It depends heavily on site size, existing vegetation, and how much grading is required, but rolling terrain and sandy soils tend to add time compared to flatter Central Florida sites, so schedules should build in that reality rather than assume a flat-site pace.
On a full-scope site development project, underground utilities are typically part of the same sequence as grading and paving, since utility trenching needs to happen while the site is still open and before final surfaces go in.
Ask how the contractor handles Minneola-specific grading and drainage, what erosion control measures are planned before mobilization (not after a rain event), and whether utility routing has been coordinated with the final paving layout.
Complete site prep in Minneola is less about any single trade and more about sequencing: clearing, grading, utilities, erosion control, and paving all have to be planned as one connected path rather than a checklist to work through independently. Foshee Construction has built its practice around this exact terrain since 1994, and current work like The Hills of Minneola shows what that sequencing looks like when it holds up through closeout. To talk through a Minneola site, start with the Foshee contact page.
We build bids using HeavyBid and AGTEK because the details matter long before the job starts. When the numbers are accurate and the scope is clearly defined, it sets the tone for how the entire project runs. Estimating isn’t just a step in the process, it’s the foundation we build on.
That same mindset carries into the field. Our crew is trained to work with purpose, follow the Civil Engineers’ Plan to the finest detail, and hold the line on quality. When expectations are clear from day one, there’s no need for shortcuts, and no confusion about how the work gets done.
Clients trust our bid packages because they’re complete and ready to use. Project managers know what we’re covering, what’s excluded, and how we plan to approach the job. That clarity removes friction and lets teams focus on execution instead of interpretation.
As part of our review process, we go into the plans before anything hits the site. We ask the questions early, resolve issues before they show up in the field, and keep RFIs moving. This approach prevents delays and protects the timeline.
Over time, that consistency builds trust. Many of the people we work with today came through referrals from past projects – engineers, GCs, and superintendents who’ve seen how we operate and want the same experience again.

In 2024, Foshee Construction was acquired by Saga Infrastructure Solutions, a national network of civil construction companies. Saga supports regional contractors by giving them access to better tools, long-term resources, and operational backing, without changing how they run day to day.
Foshee will continue to operate under its name, with the same team and field leadership in place.
“From the very time a project starts, we start that partnership. We try to catch as much as we can with the tools that we have. Not everybody is using the software platforms we are. That’s the differentiator: we’re not just bidding. We’re anticipating, problem-solving, and making sure the job runs right.”
— Don, CEO, Saga Infrastructure Solutions
Foshee is now part of a broader regional strategy that includes Florida, the Piedmont Atlantic, Texas, Colorado, and the Arizona Sun Corridor. The name, crews, and standards remain. What’s improving is the support behind it.